Projects

Mallinckrodt Pharmaceutical
Mallinckrodt Pharmaceutical
Project details
Metzler Asset Management
Metzler Asset Management
Project details
Unilever
Unilever
Project details
Dog Patch Labs
Dog Patch Labs
Project details
Zurich Ballsbridge Office Refurbishment
Zurich Ballsbridge Office Refurbishment
Project details
Paddy Power Finishes Upgrade
Paddy Power Finishes Upgrade
Project details
Zurich Centre Wexford
Zurich Centre Wexford
Project details
KCI Medical
KCI Medical
Project details
Power Tower Fit Out
Power Tower Fit Out
Project details

Paddy Power Finishes Upgrade

The office space in which a business operates often reflects that Organisation’s culture. None more so than in Power Tower. CSS were briefed with providing the recently completed offices with finishes to suit the business operations. Themes were identified and from a single page of key words CSS developed some initial concept ideas. From there the detailed office design layouts where completed. The final overall design evolved from a number of meetings. The key challenge was how to implement the changes in an area that operates 24 hours 7 days a week with the off peak times being the busiest periods for the client.

  • Unilever
  • Zurich
  • Paddy Power
  • Metzler
  • Dog Patch Labs

We provide a Design and Construction Service for clients in relation to their facility management needs.

Recent Work Contact Us